Saturday 4 November 2017

The Work Never Ends

Continuing right along... First up, finishing the master stateroom.

Port side master stateroom bulkhead. Chopped up when they ran the exhaust through. Now you see it...

...now you don't.
I managed to raise the main exhaust by 30 mm, as it was sitting fairly loose in the hangers. That will make all the difference in creating the clearance for rebuilding the storage shelf in the new bulkhead. The plan is to make up the new unit this week in the evenings at work, and with a small amount of luck I'll be able to install next weekend.

I've also (finally!) installed a salt water deck wash. The current deck outlets are fresh water; very extravagant.

Pump installed in locker in the sail locker.
I have made use of the disused through-hull in the sail locker (formerly the crew's head) that used to be the toilet discharge. I've hooked up a washdown pump and connected it to the existing plumbing that was formerly a fresh water line. Works great.

No comments:

Post a Comment