Saturday 21 September 2013

Slow Progress

The weather has been a real shit of late, which has made progress on brightwork, etc rather slow. We have finally gotten the rear of the cockpit finished, and have completed a quarter of the inside cockpit. Sharon has also been busily stripping the paint from the cabin sides, and both sides are now stripped.

The aft deck brightwork is almost done.

We've been doing a few inside jobs as well; fixed a leaky seal on one of the heads (such fun), and I am part way through plumbing, wiring and installing the frame for the washing machine. I also rewired the battery selector panel, which was previously a real screw-up of a setup, so now we can independently select house supply and engine supply from either bank. I've also started fitting new LED light units in the various lockers, and generally chipping away at that multitude of small jobs.

No comments:

Post a Comment